Overhead Monorail System

Overhead Monorail System with shifting bridge in a paint shop

Application
Overhead Monorail System with shifting bride in a paint shop

Country

Switzerland

City

Reinach

Representative office

Conductix-Wampfler AG [CH]

Operator
Magnus Ankli GmbH

Product[s]

  • C-50 Rail
  • Shifting Bridge
  • Swivel piece

Technical requirement[s]
Carriage of material, e.g. modelbuilding up to 250 kg in a paint shop

System course
Straight - Shifting bridge with 15 straight courses; Area 400 m2

Additional information

Swivel piece

  • Length 1 m
  • Interlocks directly with the shifting bridge

New engineered shifting bridge

  • Integrated safety locking
  • Easy handling due to new ergonomic control unit
Relevant Products

Manual - C-Rail Program