Technical requirement [s]: Carriage of material in a paint shopOperator: Strojírna Oslavany, s.r.o
Technical requirement[s]: Transport of car cabins through the painting line and the assembly area up to 1.000 kg
Technical requirement[s]: Carriage of material, e.g. modelbuilding up to 250 kg in a paint shopOperator: Magnus Ankli GmbH
Technical requirement: Carriage of pumps in a paint and drying plantOperator: Gardner Denver Schopfheim GmbH
Application: Overhead monorail system with painting cabin for the transport of components for the utility vehicle manufacturingOperator: Multicar, Waltershausen, [D]
Application: Single C-Rail Track with tool transporter for the final assembly of utility vehiclesOperator: Multicar, Waltershausen, [D]
Application: Overhead Monorail System with shifting bridge in a painting plant with pneumatic swivelsOperator: TRUMPF Liberec spol. s.r.o, [CZ]
Show all applications
A - 38, MIDC Phase – II, Chakan Industrial Estate Khalumbre village, Khed taluka Pune – 410 501 India
Phone: +91 2135 626600 Mobile: +91 91580 01575 Fax: +91 2135 626699
www.conductix.in/ info.in@conductix.com
vCard QR-Code How to find us